Commercial Development
Our Commercial Development project involved the development of a 2-storey commercial building that seamlessly integrated at-grade parking, a loading dock, and well-designed landscape features. To ensure effective stormwater management, we incorporated multiple underground detention tanks, complemented by meticulous infiltration design. Leveraging the Stormconn SDD3 Oil/Grit Separator enabled us to successfully meet the required water quality standards. However, the project was not without its challenges.
We had to grapple with the task of providing adequate on-site storage to meet the allowable release rate, necessitating precise calculations and strategic planning. Additionally, the process of connecting to the water main within the right-of-way while ensuring sufficient clearance over regional infrastructure demanded careful coordination and meticulous execution. Despite these challenges, the team remained dedicated to delivering an exemplary project that effectively balanced functionality, technical sophistication, and adherence to stringent water quality standards.
SPECIFICATIONS
Site Area = 2.9 ha Total Building GFA = 16,396 m² 80% enhanced water quality achieved Underground Detention Storage=577 m³ Water Balance Retention Volume=82 m³
CLIENT
Maple Reinders Constructors Ltd.
YEAR
2021
SIZE
312,153 ft²
SERVICES
Civil Engineering
PROJECT VALUE
$30 Million
PROJECT MANAGER
Chesley Blahut, P.Eng